Project Date:
November 9, 2020
Project Description:
The project consisted of roofing and building envelope improvements to several areas of the building to address historic leaks and water intrusion that was damaging interior finishes and building infrastructure. Scope included fluid applied roofing at the 4th floor east and west portions of the building as well as flashing improvements and masonry joint sealant replacement. On the 7th floor, a vented roof structure was framed and roofed in with a reinforced fluid applied roof system and stainless steel perimeter flashings. The work was done in a way to not damage the historically significant stone building with attention to the ability to the reversibility of the work.